Frequently Asked Questions
Everything you may wonder about the first meeting, site survey, design and build timelines, budgeting and warranty.
General
The first meeting is free. By phone, WhatsApp or face to face at our office, we talk about what you want to do, the condition of the space, your timeline and the budget range you have in mind. Plans, title details and photos, if you have them, make this meeting much more productive. At the end we explain clearly which service suits you, how the process will run and a rough timeline. There is no pressure to decide.
The first site visit within our service area is free; we see the space and listen to your needs on site. The detailed measurements, measured survey drawings and condition report that the project is based on are part of the design service and are listed as a separate item in the quote. If you only need a measured survey, we can price that separately too.
The design fee depends on the floor area, the scope (concept only or including construction drawings), the number of rooms, the amount of bespoke furniture and detailing, and whether you want site supervision. After the first meeting we define the scope in writing and state the fee and what will be delivered at each stage clearly in the quote. Where you also give us the build, design and construction costs are shown separately, so there are no surprise items.
We discuss the budget at the start of the design, not at the end. During the concept stage we select materials and products within the range you have given us and offer alternatives for each item. During the build, an itemised cost summary and programme are shared. If something unforeseen comes up on site (for example rotten pipework inside a wall), we first tell you with photos, present the cost in writing and do not proceed without your approval.
For design services, payment is usually split into stages: a first payment on signing, a second on concept approval and a final one on delivery of the construction drawings. For build work, payments are tied to stages in the programme (heavy works, services, finishes, handover), and a photo report of the work done is shared at each stage. The payment plan is written into the contract.
Yes, many of our clients are villa and home owners living abroad. We hold design presentations by video call and get material and product approvals online. During the build we send weekly photo and video site reports and call you separately for important decisions. At handover we share a detailed video and user notes. Keys can also be handed to a caretaker, property manager or someone you authorise. We can work with you in Turkish or English.
Our office is in Ortaca. We work most often in Ortaca, Dalyan, Dalaman and Köyceğiz, and in Fethiye, Göcek and Marmaris on planned visit days. Projects in other districts of Muğla are considered depending on their scope. Design-only and 3D visualisation services can also be provided fully online, with no regional limit.
It varies a lot with scope. A single bathroom renovation usually takes a few weeks, while a complete flat renovation can take two to three months including design. For a villa interior or a new building, the timeline is measured in months once permits, manufacturing and the build are included. After the survey we give you a stage-by-stage programme, and for work that must be finished before the season we plan backwards from the deadline.
For work we carry out, we give a written guarantee on workmanship; its duration and scope are set out in the contract. Products and appliances are covered by their manufacturers’ warranties, and we hand over the warranty documents at completion. If a problem appears after handover, we inspect it on site and fix it free of charge if it is due to workmanship. Details are on our Service Contract Principles page.
Of course. You can take the design and construction drawings only and have the work done by your own builders. In that case we recommend our periodic site inspection service so the drawings are read correctly on site and you can be sure the details are built as designed. If you wish, we can also refer you to tradespeople and suppliers we trust.
Interior Architecture and Interior Solutions
It varies with scope, but a typical interior design project includes a measured survey, layout plan, concept and material palette, 3D visuals, ceiling, lighting and electrical plans, floor and wall finishes plans, bespoke furniture drawings, wet room details and a materials and products schedule. The list of every drawing to be delivered is stated in the quote.
Once the concept is approved, we choose together using real samples. At our Ortaca office you can see finishes, fabrics and surface samples side by side, and where needed we visit suppliers’ showrooms together. For every choice we discuss not only looks but also durability, ease of maintenance and how it copes with humidity and salt in a coastal climate.
Yes, and we encourage it. During the survey we list together the furniture, rugs, lighting or artwork you value and build the design around them. Where needed we refresh an old piece with new upholstery, polish or paint so it finds its place in the new space. This eases the budget and makes the home feel truly yours.
Architectural Design and Drawings
We first review the plot’s zoning status and any conservation decisions to establish what can be built. We then prepare the architectural design, coordinate the structural, mechanical and electrical designs with the relevant engineers, compile the application file and make any revisions requested during the process. Approval times depend on the authorities involved, so we always plan the timeline with a realistic margin.
It depends on the plot. In special environmental protection areas such as Köyceğiz–Dalyan and Fethiye–Göcek, and in heritage zones, building rights are more limited and additional approvals may be needed for facades, building heights and materials. We recommend consulting us before buying land or a house; we review the zoning status so you can see what is possible before you commit.
Not every wall can be removed. We decide only after inspecting on site whether it is load-bearing and how the building’s structure is performing, and where necessary we get a structural engineer’s opinion. Even when an opening in a load-bearing wall is possible, it must be done with a proper strengthening detail and the required permits. We never compromise on the safety of the building.
Renovation and Refurbishment
It depends on the scope. For a single bathroom or kitchen renovation, sequencing the work usually lets you stay at home. For extensive renovations where services are fully renewed and several rooms are stripped at once, we recommend moving out because of dust, noise and interruptions to water and power. We plan the programme with you accordingly.
For interior renovations, informing the building management and respecting working hours is usually enough. However, work affecting common areas, the facade, enclosing a balcony or the structure may require the consent of the other owners and municipal permission. We clarify this with you during the survey and schedule noisy work after informing the neighbours in advance.
Construction and Contracting Services
In turnkey projects we are your single point of contact from design to handover. Coordinating tradespeople, suppliers and engineering disciplines, the programme, quality control and site safety are our responsibility. Scope, handover date, payment stages and warranty terms are defined in writing in the contract.
Every project has a dedicated contact person. Weekly photo progress reports, a progress payment summary at the end of each stage and programme updates are shared regularly. You can visit the site with us whenever you like, and if you are abroad we can give you a live video tour of the site.
Kitchen and Bathroom Design
Once design and product selection are complete, a bathroom renovation usually takes one to two weeks and a kitchen two to four weeks, depending on cabinet manufacturing time. Bespoke cabinets are made to final site measurements after the heavy work is done, so we confirm the total time with a programme during the survey.
Because it sits under the tiles and is never seen again once done, yet mistakes come back as leaks into the flat below, mould and cracked tiles. In bathrooms we apply a suitable waterproofing membrane to the floor and shower walls, fit sealing tape in the corners and carry out a water test before tiling. This step is the most important part of a long-lasting bathroom.
3D Visualisation and Consultancy
3D visuals let you see colour, materials, light and proportions before any work begins, so you can make decisions with confidence. We prepare them using real product and material choices, the true dimensions of the space and the actual direction of daylight. When the same products are used on site, the result comes very close to the images; with materials such as natural stone and timber, we point out in advance that natural variations in texture can occur.
Yes. We inspect the house or plot you are considering on site and give you a written assessment of the building’s general condition, the likely renovation scope, zoning and conservation conditions and a rough cost range. This short consultancy helps you avoid surprises, especially with old stone houses and plots in protected areas.
Real Estate Sales & Purchase
Because the real value of a home or plot is directly linked to the building’s technical condition and what can be done with it. As we can read the structure, damp, services and zoning conditions, we can help sellers prepare their home properly and help buyers make a decision without surprises. We provide brokerage within the relevant legislation and under a written agreement; the title transfer itself is handled officially at the land registry office.
Not always. Small jobs such as fixing damp and leaks, warm neutral paint, new grout and taps, good lighting and a tidy presentation often have a positive effect on the sale price and how quickly the home sells. Big spending such as a complete new kitchen or bathroom, on the other hand, does not always pay back. After seeing the home on site, we tell you clearly which jobs will add value and which are unnecessary.
We inspect the building on site and assess visible cracks and damage in the structure, damp and waterproofing problems, the condition of the roof and facade, the age of the services and permit and occupancy records. Findings are presented in a report with photos, grouped by priority, with a possible solution and rough cost range for each. This inspection does not replace laboratory-based structural tests such as core sampling carried out by licensed firms where needed; if we see such a need, we say so clearly.
Urban Renewal
A risky building assessment is carried out by firms licensed by the Ministry of Environment, Urbanisation and Climate Change, and the result is reported to the relevant authority. We do not issue the report; as an independent architect we support you in preparing the application documents, coordinating with the licensed firm and explaining the result clearly to the owners. As procedures and conditions may change, we recommend confirming current information with the relevant authority.
Under urban renewal, owners may be offered support such as rent assistance, interest-subsidised loans and certain fee and tax exemptions. However, as the scope, amounts and conditions of these schemes change from time to time, rather than quoting fixed figures we recommend confirming the current terms with the Ministry, your municipality and banks. We list the documents needed for the application together with you.
The time depends largely on how quickly owners agree, the permit process and the size of the building. The risky building assessment, agreement and design stages can take a few months, while construction of a medium-sized apartment block is usually completed in 12–18 months. At the feasibility stage we prepare a written draft timeline specific to your building.