From design to turnkey handover, we build with confidence.
0543 929 55 23
Let’s Plan a First Meeting 0543 929 55 23 WhatsApp

Mon–Fri 09:00–18:30 · Sat by appointment

Urban Renewal

Turning old and at-risk buildings into safe homes in Ortaca, Dalaman, Köyceğiz and Fethiye: risky building assessment process advice, flat-for-land agreements and feasibility, renewal design and permits, demolition and turnkey rebuilding.

Our Urban Renewal Services

4 services
Urban Renewal

Why Urban Renewal Matters

Muğla is one of Turkey’s regions where earthquake risk calls for attention. Many local apartment blocks were built before current seismic codes, sometimes without proper inspection, and over the years humidity, sea air and lack of maintenance have worn down concrete and reinforcement. Urban renewal replaces these buildings with safe, energy-efficient homes suited to modern life. For us, it is a journey to be taken calmly, with information rather than fear.

The Process Step by Step

Every building has its own story, but the main steps of renewal are usually the same. Knowing from the start what happens at each step reduces uncertainty and worry among the owners.

  • Risky building assessment: carried out by firms licensed by the Ministry; the result is reported to the relevant authority.
  • Agreement and feasibility: a decision among the owners, an outline of the new project and the sharing principles.
  • Vacating: the building is emptied through the procedures set out in the legislation.
  • Demolition: controlled demolition with the required permits and site safety.
  • Design and permit: architectural and engineering drawings and a building permit from the municipality.
  • Construction: building work tied to a programme, under the supervision of a building inspection firm.
  • Handover: flats handed to the owners together with occupancy and title procedures.

Government Support

Under urban renewal, owners may be offered support such as rent assistance, interest-subsidised loans and certain fee and tax exemptions. As the scope, amounts and conditions of these schemes change from time to time, we recommend confirming the current terms with the Ministry of Environment, Urbanisation and Climate Change, your municipality and banks. We list the documents needed for applications together with you.

What an Architecture Office Brings to Renewal

Renewal is often described simply as “the old building goes, a new one comes”. Yet the quality of the new plan, sun and view orientation, parking, shared spaces and the material specification will shape the owners’ lives for decades. At Nest Yapı Mimarlık we start the process with the design and let each owner decide after seeing their new flat in drawings and 3D images. We can provide design and advice only, or take on the whole process from demolition to turnkey handover.

Transparent Communication with Owners

The hardest part of renewal is often not the construction but the shared decision. We attend meetings, answer technical questions in plain language and put the sharing and handover terms in writing so they can be compared. For legal matters we recommend that owners work with a lawyer, and we coordinate with them.

How Long Does It Take?

The time from assessment to handover depends on how quickly owners agree, the permit process and the size of the building. For a medium-sized apartment block, construction usually takes 12–18 months, and a few months should also be allowed for the agreement and design stages before that.

Frequently asked questions about Urban Renewal

A risky building assessment is carried out by firms licensed by the Ministry of Environment, Urbanisation and Climate Change, and the result is reported to the relevant authority. We do not issue the report; as an independent architect we support you in preparing the application documents, coordinating with the licensed firm and explaining the result clearly to the owners. As procedures and conditions may change, we recommend confirming current information with the relevant authority.

Under urban renewal, owners may be offered support such as rent assistance, interest-subsidised loans and certain fee and tax exemptions. However, as the scope, amounts and conditions of these schemes change from time to time, rather than quoting fixed figures we recommend confirming the current terms with the Ministry, your municipality and banks. We list the documents needed for the application together with you.

The time depends largely on how quickly owners agree, the permit process and the size of the building. The risky building assessment, agreement and design stages can take a few months, while construction of a medium-sized apartment block is usually completed in 12–18 months. At the feasibility stage we prepare a written draft timeline specific to your building.

Our Urban Renewal Projects

Related Guides

The Urban Renewal Process Step by Step
22 October 2026 · 4 min read

The Urban Renewal Process Step by Step

From the risky building assessment to turnkey handover, we explain the main steps of urban renewal, what owners should watch out for and how to approach government support, calmly and clearly.

Nest Yapı Mimarlık

The First Meeting Is Free

Let us meet over a coffee, walk through your space together and hear about your vision. We will then share the roadmap and an indicative budget with you.