From design to turnkey handover, we build with confidence.
0543 929 55 23
Let’s Plan a First Meeting 0543 929 55 23 WhatsApp

Mon–Fri 09:00–18:30 · Sat by appointment

Flat-for-Land Agreement and Feasibility Advisory

Technical feasibility and agreement advice before a renewal decision, showing what the new building can hold, each owner’s share and how flat-for-land offers compare.

Flat-for-Land Agreement and Feasibility Advisory – Ortaca

Key advantages

  • Buildability analysis under zoning
  • Outline plans and flat types for the new building
  • Existing versus new floor area comparison
  • Approximate cost and time estimate
  • Comparison table of flat-for-land offers
  • Technical contract annexes and meeting support

The most critical decision in urban renewal is who will rebuild the building and on what terms. Flat-for-land offers from contractors often rest on different assumptions and are hard to compare side by side. We bring the offers onto the same technical footing so owners can decide with full information.

Feasibility Study

  • Buildable floor area under current zoning status and plan notes.
  • Outline floor plans and flat types for the new building.
  • Comparison of existing and new flat sizes.
  • Approximate construction cost and time estimate.
  • A rough comparison of flat-for-land, self-build and mixed models.

Comparing Offers

Alongside the share ratio, we set out delivery time, what happens in case of delay, the material and brand specification, parking and shared spaces, guarantees and how rent assistance will be handled in one table. This shifts the conversation from “the highest ratio” to “the soundest agreement”. For the legal side of the contract we recommend that owners work with a lawyer, and we prepare the technical annexes together.

Owners’ Meetings

We attend meetings, explain the feasibility results in a simple presentation and answer questions in everyday rather than technical language. Our aim is for everyone to sign knowing what they are agreeing to and why.

Frequently asked questions

A risky building assessment is carried out by firms licensed by the Ministry of Environment, Urbanisation and Climate Change, and the result is reported to the relevant authority. We do not issue the report; as an independent architect we support you in preparing the application documents, coordinating with the licensed firm and explaining the result clearly to the owners. As procedures and conditions may change, we recommend confirming current information with the relevant authority.

Under urban renewal, owners may be offered support such as rent assistance, interest-subsidised loans and certain fee and tax exemptions. However, as the scope, amounts and conditions of these schemes change from time to time, rather than quoting fixed figures we recommend confirming the current terms with the Ministry, your municipality and banks. We list the documents needed for the application together with you.

The time depends largely on how quickly owners agree, the permit process and the size of the building. The risky building assessment, agreement and design stages can take a few months, while construction of a medium-sized apartment block is usually completed in 12–18 months. At the feasibility stage we prepare a written draft timeline specific to your building.

Other Urban Renewal services

Urban Renewal

Project examples

Nest Yapı Mimarlık

The First Meeting Is Free

Let us meet over a coffee, walk through your space together and hear about your vision. We will then share the roadmap and an indicative budget with you.