From design to turnkey handover, we build with confidence.
0543 929 55 23
Let’s Plan a First Meeting 0543 929 55 23 WhatsApp

Mon–Fri 09:00–18:30 · Sat by appointment

Renewal Design: Architectural Project and Permit

An architectural design for a building to be demolished and rebuilt that listens to the owners’ needs and is earthquake-resistant and pleasant to live in, with engineering coordination and the building permit process.

Renewal Design: Architectural Project and Permit – Ortaca

Key advantages

  • Measured survey of the existing building
  • Owners’ needs analysis
  • Concept design, flat types and 3D images
  • Coordination with structural and services designs
  • Permit drawings and municipal follow-up
  • Construction drawings and material specification

A renewal design shapes a building’s next fifty years. Fitting the plan within zoning rules is therefore not enough; each flat’s daylight, ventilation, storage and balcony matter as much as its floor area. On apartment renewals in Ortaca, Dalaman and Fethiye, we work by listening to each owner in turn.

Scope

  • Measured survey of the existing building and the owners’ needs list.
  • Concept design: site plan, floor plans, flat types and 3D images.
  • Coordination with structural, mechanical and electrical designs.
  • Permit drawings for the municipality and process follow-up.
  • Construction drawings and material specification.

Earthquake-Resistant and Liveable

As Muğla lies in an earthquake zone, we develop the structural concept with the structural engineer from the first day of design. A regular, symmetrical system, a ground floor arrangement that avoids a soft storey and a proper soil survey are the foundation of safety. Thermal insulation, shading, cross-ventilation and the quality of shared spaces then make daily life in the building more pleasant.

The Permit Process

We follow up the documents, authority approvals and building inspection procedures required for the permit application on your behalf. Timelines vary with the municipality’s workload and whether paperwork is complete; we report each stage regularly to the owners.

Frequently asked questions

A risky building assessment is carried out by firms licensed by the Ministry of Environment, Urbanisation and Climate Change, and the result is reported to the relevant authority. We do not issue the report; as an independent architect we support you in preparing the application documents, coordinating with the licensed firm and explaining the result clearly to the owners. As procedures and conditions may change, we recommend confirming current information with the relevant authority.

Under urban renewal, owners may be offered support such as rent assistance, interest-subsidised loans and certain fee and tax exemptions. However, as the scope, amounts and conditions of these schemes change from time to time, rather than quoting fixed figures we recommend confirming the current terms with the Ministry, your municipality and banks. We list the documents needed for the application together with you.

The time depends largely on how quickly owners agree, the permit process and the size of the building. The risky building assessment, agreement and design stages can take a few months, while construction of a medium-sized apartment block is usually completed in 12–18 months. At the feasibility stage we prepare a written draft timeline specific to your building.

Other Urban Renewal services

Urban Renewal

Project examples

Nest Yapı Mimarlık

The First Meeting Is Free

Let us meet over a coffee, walk through your space together and hear about your vision. We will then share the roadmap and an indicative budget with you.