From design to turnkey handover, we build with confidence.
0543 929 55 23
Let’s Plan a First Meeting 0543 929 55 23 WhatsApp

Mon–Fri 09:00–18:30 · Sat by appointment

Demolition, Rebuild and Turnkey Delivery

From controlled demolition to the structural frame, finishing works, occupancy and handover, we build your renewal building under one contract with a written programme and regular reporting.

Demolition, Rebuild and Turnkey Delivery – Ortaca

Key advantages

  • Demolition permit and controlled demolition
  • Foundations, structure and insulation
  • Services, windows and finishing works
  • Shared spaces, parking and landscaping
  • Monthly progress report with photos
  • Occupancy, handover and snagging

Once design and permit are complete, the most visible stage of renewal begins: demolition and rebuilding. What owners need most at this point is to know regularly when and how the work is progressing. On renewal buildings in and around Ortaca, we deliver the build under one contract, supervised by a building inspection firm and with a transparent programme.

Construction Stages

  • Demolition permit, site safety and controlled demolition, with sorted waste removal.
  • Foundations and structural frame in line with the soil survey.
  • Roof, facade, thermal insulation and waterproofing.
  • Services, windows and doors, finishing works and shared spaces.
  • Landscaping, parking and external works.
  • Occupancy application and handover of flats to the owners.

Transparent Follow-Up

We share a written programme tied to progress payments and send a monthly progress report with photos. Samples of the products in the material specification are submitted for the owners’ approval. Noise, dust and safety measures for neighbouring buildings and the street are planned from the start.

Quality and After Handover

At handover a snagging list is drawn up together for each flat and resolved. After handover we stay by your side on workmanship issues throughout the legal warranty periods. For owners who want further interior changes to their own taste, our interior design support is also available.

Frequently asked questions

A risky building assessment is carried out by firms licensed by the Ministry of Environment, Urbanisation and Climate Change, and the result is reported to the relevant authority. We do not issue the report; as an independent architect we support you in preparing the application documents, coordinating with the licensed firm and explaining the result clearly to the owners. As procedures and conditions may change, we recommend confirming current information with the relevant authority.

Under urban renewal, owners may be offered support such as rent assistance, interest-subsidised loans and certain fee and tax exemptions. However, as the scope, amounts and conditions of these schemes change from time to time, rather than quoting fixed figures we recommend confirming the current terms with the Ministry, your municipality and banks. We list the documents needed for the application together with you.

The time depends largely on how quickly owners agree, the permit process and the size of the building. The risky building assessment, agreement and design stages can take a few months, while construction of a medium-sized apartment block is usually completed in 12–18 months. At the feasibility stage we prepare a written draft timeline specific to your building.

Other Urban Renewal services

Urban Renewal

Project examples

Nest Yapı Mimarlık

The First Meeting Is Free

Let us meet over a coffee, walk through your space together and hear about your vision. We will then share the roadmap and an indicative budget with you.