From design to turnkey handover, we build with confidence.
0543 929 55 23
Let’s Plan a First Meeting 0543 929 55 23 WhatsApp

Mon–Fri 09:00–18:30 · Sat by appointment

Köyceğiz Urban Renewal

We offer Urban Renewal for homes, villas and businesses in Köyceğiz: first an on-site survey and measured drawing, then concept and 3D, and with your approval a well-planned build.

≈ 22 kmto our Ortaca office

We create tailored solutions for apartments and offices in central Köyceğiz and for detached houses and villas in the surrounding area.

Köyceğiz is about 22 km from our Ortaca office (20 min by car); we can usually visit for a site survey within a few days.

In urban renewal, timing depends largely on the owners’ agreement and the permit process; building a medium-sized apartment block usually takes 12–18 months. We are still here after handover; we support you on any workmanship issues throughout the warranty period.

Our Urban Renewal services in Köyceğiz

Köyceğiz Risky Building Assessment Process Advisory
Köyceğiz Flat-for-Land Agreement and Feasibility Advisory
Köyceğiz Renewal Design: Architectural Project and Permit
Köyceğiz Demolition, Rebuild and Turnkey Delivery

Why choose us?

  • A calm, transparent process from risky building assessment to turnkey handover
  • Flat-for-land offers compared side by side on one technical table
  • An earthquake-resistant new building designed around the owners’ needs
  • In Köyceğiz, the first meeting is free

Areas we serve around Köyceğiz

Cengiz TopelUlucamiGülpınarToparlarDöğüşbelenZeytinalanıHamitköySultaniyeÇandırEkincikBeyobası

Project examples

FAQs

Yes. In Köyceğiz the first meeting and site survey are free; our architect visits the space, listens to your needs and we send you the roadmap in writing.

In urban renewal, timing depends largely on the owners’ agreement and the permit process; building a medium-sized apartment block usually takes 12–18 months. Köyceğiz is about 22 km from our Ortaca office (20 min by car); we can usually visit for a site survey within a few days.

A risky building assessment is carried out by firms licensed by the Ministry of Environment, Urbanisation and Climate Change, and the result is reported to the relevant authority. We do not issue the report; as an independent architect we support you in preparing the application documents, coordinating with the licensed firm and explaining the result clearly to the owners. As procedures and conditions may change, we recommend confirming current information with the relevant authority.

Under urban renewal, owners may be offered support such as rent assistance, interest-subsidised loans and certain fee and tax exemptions. However, as the scope, amounts and conditions of these schemes change from time to time, rather than quoting fixed figures we recommend confirming the current terms with the Ministry, your municipality and banks. We list the documents needed for the application together with you.

The time depends largely on how quickly owners agree, the permit process and the size of the building. The risky building assessment, agreement and design stages can take a few months, while construction of a medium-sized apartment block is usually completed in 12–18 months. At the feasibility stage we prepare a written draft timeline specific to your building.
Nest Yapı Mimarlık

First meeting and site survey for Köyceğiz

Let us meet over a coffee, walk through your space together and hear about your vision. We will then share the roadmap and an indicative budget with you.